Yellowhead Trail Expansion – 156 St to St Albert Trail (2023)

Location – Edmonton
Owner – City of Edmonton

While working within a major roadway corridor, CKB completed a 10m deep excavation for the installation of a new oilgrit separator structure, including a hand excavated tunnel for the connection to the 1050mm concrete pipe. Existing pipes up to 1200mm in diameter were isolated using bulk heads and abandoned with pumped cellular grout.