In the Willow Park neighbourhood, CKB upgraded the storm sewer and water systems by removing the existing infrastructure and installing largerdiameter piping, including storm mains up to 1050mm. The rehabilitation work also included the installation of new storm mains, manholes, leads, and catch basins to enhance system capacity and longterm performance.