Wabamun Wastewater Lagoon Rehabilitation (2025)
Location – Wabamun
Owner – Parkland County
CKB was contracted to complete critical repairs at the Wabamun lagoon. In 2024, we reconstructed a failed berm on the storage cell to restore containment and system integrity. In 2025, the work continued with the replacement of the inlet structure, a control structure, and multiple valves throughout the lagoon, improving overall functionality and longterm reliability and pedestrian access to all residences. This showcased CKB’s ability to complete the work while still prioritizing the residents of the neighbourhood.
