Outfall 11D, N6, N9 Improvements (2022)
Location – St Albert
Owner – City of St Albert
While implementing specific mitigation measures to protect the environment during the instream work, CKB completed the removal and replacement of the concrete outfall piping and flared ends for each of the three locations. Existing sinkholes were remediated and the new outfalls were complete with the installation of rip rap and other erosion protection materials, chain-link fence, and landscaping.
